πŸ”Œ Generation Capacity πŸ’‘
 1 Lakh MW generation capacity added. (2,43,029 MW in March 2014 to 3,44,002 MW in March 2018)
 India emerges as net exporter of electricity. 7203 MU supplied to Nepal, Bangladesh and Myanmar in FY 2017-18.
 Energy deficit reduced from 4.2 per cent (in FY 2013-14) to 0.7 per cent (in FY 2017-18)
πŸ”Œ One Grid One Nation πŸ’‘
 Expansion of transmission grid by 1 lakh ckm
 Highest ever transformation capacity addition of 86,193 MVA in FY 2017-18
 26 projects worth Rs. 48,427 crore awarded through Tariff Based Competitive Bidding
 Inter-regional transfer capacity addition more than tripled (16,000 MW in FY 2010-14 and 50,500 MW in FY 2014-18)
πŸ”Œ DeenDayalUpadhyaya Gram JyotiYojana (DDUGKY) πŸ’‘
 100 per cent of village electrification with Outlay of Rs. 75,893 crore
 Funds to states increased by 2.5 times (Rs. 10,873 crore in FY 2010-14 and Rs 24,890 crore in 2014-18)
 2,56,750 km HT and LT lines
 4,09,989 distribution transformers
πŸ”Œ Integrated Power Development Scheme (IPDS) πŸ’‘
 Outlay of Rs. 65,424 crore
 1376 towns IT enabled
 1900 additional towns under progress
 1156 towns reported reduction in AT&C losses
 1,29,093 km HT and LT lines
 66,947 distribution transformers
πŸ”Œ UDAY πŸ’‘
 More than Rs 20,000 crore interest cost saved by DISCOMs under UDAY
 Reduction in AT&C losses in 17 states within one year of operation
 Revenue gaps bridged by 33 per cent in one year of operation
 India’s rank improved to 29 in 2018 from 111 in 2014on World Bank’s Ease of Getting Electricity Ranking.
πŸ”Œ SAUBHAGYA πŸ’‘
 Launched for universal electrification
Camps organised at village level. Minimum documentation required
 Special drive for economically weaker sections under Gram Swaraj Abhiyan 60.34 lakh housholds electrified since 11th Oct, 2017
πŸ”Œ Power for All 24*7 πŸ’‘
 Joint initiative of Govt of India and State Govts.
 Roadmap for 24*7 power supply prepared. States ready to ensure 24*7 Power for All from 1st April, 2019.
πŸ”Œ Focus on North-East region πŸ’‘
 Electrification of 5855 villages and intensive electrification of 9004 villages completed.
 130 towns IT enabled.
 52.28 lakh LED bulbs distributed under UJALA
 Rs. 9866 crore projects undertaken for strengthening/development of intra-state transmission
πŸ”Œ UJALA πŸ’‘
 107 crore LED bulbs distributed
 30.01 crore LED bulbs distributed under  UJALA resulting in saving of 15,500 crore per year
 77.99 crore additional LED bulbs distributed by industry.
 87 per cent reduction in LED bulb procurement cost through demand aggregation.
πŸ”Œ Hydel Power πŸ’‘
 4376 MW hydel capacity addition (FY 2014-18)
πŸ”Œ Innovations & Initiatives
 Nolicence required for charging stations & Procurement of 10,000 e-vehicles for Government institutions Smart Metering.
 Procurement of 50 lakh smart meters done & 1 crore prepaid meters under procurement.
 Star labelling program saved energy worth Rs. 22,500 crore.
 Energy efficiency measures through PAT in large industries saved energy worth Rs. 9500 crore.
 Energy Conservation Building Code for energy efficient buildings launched in June, 2017
 e-Bidding and e-Reverse Auction for short and medium term procurement of power.
 Enabling payments through NPCI platforms such as BHIM, BBPS, Bharat QR etc. More than 24 crore digital transactions in FY 2017-18 for electricity bill payments.